Deutsche bank
London | UK
Delivered critical path M&E planning and integrated it with the master programme.
Deployed Power BI dashboards for live tracking and stakeholder reporting.
Applied interface management, delay mitigation, and risk reviews to maintain control.
Frankfurt Data Centre
Frankfurt | Germany
Led master programme development, procurement alignment, and commissioning strategy.
Delivered real-time Power BI dashboards and programme health checks.
Ensured on-time delivery using delay analysis and predictive risk modelling.


Fairmont Ramla
Riyadh | Saudi Arabia
Provided master planning and trade interface coordination across MEP and fit-out.
Used progress dashboards and contractor productivity reviews for performance insight.
Delivered on spec with tight sequencing, using risk mitigation planning.
Dubai Towers
Doha | Qatar
Performed forensic delay analysis and led programme recovery strategy.
Delivered contractual dispute resolution support and planning re-sequencing.
Reignited progress with integrated dashboards and interface controls.


Lamar Towers
Jeddah | Saudi Arabia
Delivered 4D BIM planning, phased programme sequencing, and fit-out logistics.
Facilitated shop drawing coordination and progress forecasting.
Reduced interface risks with advanced digital planning tools.
Wafi Hotel Bur Dubai
Dubai | UAE
Managed logistics planning, evolving design scope, and HSQ tracking.
Applied AI-powered reporting, live dashboards, and delay modelling.
Delivered the project on time with minimal dispute and seamless stakeholder reporting.


DWD – Deira Waterfront
Dubai | UAE
Created multi-package master programme and infrastructure phasing.
Aligned utilities, traffic, and vertical construction using interface management.
Prevented delays with proactive planning and stakeholder engagement workshops.
Akoya Oxygen
Dubai | UAE
Applied modular programming and earned value management (EVM).
Delivered Power BI progress tracking and dispute support via claims data.
Achieved regional benchmark status for sustainable planning and delivery.


3 Sides Mall
Cairo | Egypt
Deployed short-term lookahead planning and fit-out sequencing.
Used delay analysis tools and tenant coordination workshops.
Ensured timely handover and full occupancy readiness.
ZED Towers
Elsheikh Zayed | Egypt
Introduced 4D BIM planning, programme dashboards, and delay exposure tools.
Delivered real-time contractor productivity forecasting.
Achieved milestone alignment through sequencing and interface control.


The Waterway
Cairo | Egyp
Delivered zoning-based programme planning and contractor integration strategy.
Applied visual progress dashboards and handover control tracking.
Enabled staged occupancy with no utility or service delay.
Panda Park
Doha | Qatar
Frankfurt | Germany
Managed specialist MEP integration, commissioning, and logistics sequencing.
Used compliance dashboards for Chinese and Qatari stakeholder requirements.
Delivered a world-first zoological facility using AI-driven tracking and risk tools.